Registration requested
Registry observedVerra VCS 4845 public record, observed 24 Sep 2026 · Overview > StatusCAMERR
Inside the VCS 4845 design: a 1,055 ha first activity instance, a 2,000 ha grouped restoration aim, a 40-year carbon forecast and proposed field monitoring. These are filed plans, not verified outcomes.
Image credit
–
Registry observedVerra VCS 4845 public record, observed 24 Sep 2026 · Overview > Registration date0 VCUs
Registry observedVerra VCS 4845 public record, observed 24 Sep 2026 · Overview > Issued VCUsAENOR CONFIA, S.A. (UNIPERSONAL)
Registry observedVerra VCS 4845 public record, observed 24 Sep 2026 · Overview > Validation/verification bodyA named body does not establish a completed validation opinion.Registration has been requested; no VCUs have been issued.
Project design
The PDD describes a grouped restoration project; its scope is separate from the existing BluEdea overview.
CAMERR
Version 1.0; 1 April 2025Project maps are in the public PDD. Their republication rights were not established.
Open the source filingInspect source records and page citations
Planète Urgence
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 1, 11Version 1.0; 1 April 2025
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 1VM0033 v2.1
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 5, 62–65Registry Overview displays VM0033 with “Version NA”.25 July 2022 to 24 July 2062, 40 years
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 1, 11Project milestones
The VCS crediting period and the operator programme horizon use different end dates.
- VCS start25 July 2022Filed design
- Filed crediting period25 July 2022 to 24 July 2062, 40 yearsFiled design
- Owner programme horizon2022–2052Owner report
- PDD issueVersion 1.0; 1 April 2025Filed design
Inspect source records and page citations
25 July 2022
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 1, 1125 July 2022 to 24 July 2062, 40 years
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 1, 112022–2052
Owner reportPlanète Urgence CAMERR programme summary · physical p. 1Version 1.0; 1 April 2025
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 1Project geography and imagery
The filed KML is mapped below. The regional photograph is context, not evidence of activity at a filed plot. PDD figures on physical pp. 8 and 29 remain at source because reproduction rights were not established.
Where the first activity instance is filed
Two degraded-area layers in CAMERR’s filed KML cover about 1,055 ha. These are proposed VCS geography, not proof of planting, eligibility validation or the wider 2,000-ha grouped ambition.
Loading filed geometry…
Drag to explore · pinch, scroll or use controls to zoom. Geometry is a filed proposal, not an observed restoration outcome.
Map credit
Geometry: Verra VCS 4845, VS ID 4845 01.04.2025.kml · Documents > Other, observed 24 Sep 2026.Verra source record ↗Basemap: OpenStreetMap contributors. Areas calculated geodesically from filed coordinates.The map above uses the project’s Verra-held KML. Filing figures remain at source unless reuse rights are documented.
Open Verra filing ↗View CAMERR project photographs at source ↗Carbon forecast
These estimates are ex ante. The public materials reviewed establish no verified removals.
Filed ex-ante removals model, not monitored removals, after-buffer credits or issuance. The 41 calendar-year rows sum to 626,476 tCO₂e, one tonne below the PDD stated total; the 40-year period has partial start and end years. The filing labels 2062 as a calendar year although crediting ends 24 July 2062.
Open all 41 filed annual rows
| Year | Annual model | Cumulative model | Source page |
|---|---|---|---|
| 2022 | 0 | 0 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2023 | 19 | 19 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2024 | 48 | 67 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2025 | 45 | 112 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2026 | 118 | 230 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2027 | 209 | 439 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2028 | 348 | 787 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2029 | 546 | 1,333 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2030 | 917 | 2,250 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2031 | 1,510 | 3,760 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2032 | 2,427 | 6,187 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2033 | 3,799 | 9,986 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2034 | 5,779 | 15,765 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2035 | 8,514 | 24,279 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2036 | 12,105 | 36,384 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2037 | 16,567 | 52,951 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2038 | 21,782 | 74,733 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2039 | 27,473 | 102,206 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2040 | 33,213 | 135,419 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2041 | 38,476 | 173,895 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2042 | 42,717 | 216,612 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 12 |
| 2043 | 45,482 | 262,094 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2044 | 46,502 | 308,596 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2045 | 45,743 | 354,339 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2046 | 43,402 | 397,741 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2047 | 39,842 | 437,583 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2048 | 35,504 | 473,087 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2049 | 30,816 | 503,903 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2050 | 26,139 | 530,042 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2051 | 21,730 | 551,772 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2052 | 17,750 | 569,522 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2053 | 14,273 | 583,795 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2054 | 11,313 | 595,108 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2055 | 8,841 | 603,949 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2056 | 6,809 | 610,758 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2057 | 5,160 | 615,918 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2058 | 3,833 | 619,751 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2059 | 2,774 | 622,525 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2060 | 1,934 | 624,459 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2061 | 1,270 | 625,729 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
| 2062 | 747 | 626,476 | CAMERR VCS Project Description v1.0, 1 Apr 2025, physical p. 13 |
Inspect source records and page citations
626,477 tCO₂e over 40 years
Ex-ante modelCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical pp. 12–13, 128–132; Tables 35–3615,662 tCO₂e per year
Ex-ante modelCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 1327%
Ex-ante modelCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical pp. 5, 128–13215,662 tCO₂e per year
Registry observedVerra VCS 4845 public record, observed 24 Sep 2026 · Overview > Estimated annual emission reductionsVM0033 v2.1
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 5, 62–65Registry Overview displays VM0033 with “Version NA”.Restoration and biodiversity
The filing, registry and operator programme use distinct area scopes. None is an independently measured restored area.
First activity instance by restoration zone
1,055 ha filed first-instance boundary; these areas are not completed restoration.
Basis: First CAMERR VCS activity instance (1,055 ha)
2 m × 2 m spacing
CommitmentRhizophora spp. / Avicennia germinans, approximately
Filed designBefore planting
Filed designArea reported reforested
Proponent figures stated in the filed PDD; no independent planting verification is inferred.
Annual reforested area, not cumulative first-instance coverage · Filed progress
Dibombari, Manoka, Mouanko; filed boundary
Filed design / proponent claimFuture instances included; design target
Filed design / proponent claimRhizophora racemosa, R. mangle, A. germinans
Filed design / proponent claimInspect source records and page citations
1,055 ha
Registry observedVerra VCS 4845 public record, observed 24 Sep 2026 · Overview > Project area1,055 ha in Dibombari, Manoka and Mouanko
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 8, 292,000 ha
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 4, 8Additional project activity instances are proposed.1,000 ha, rounded
Owner reportPlanète Urgence CAMERR programme summary · physical p. 1Programme target; separate from the VCS instance and grouped aim.Nurseries, invasive-plant removal, mangrove planting and assisted regeneration
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 4, 14–19Rhizophora racemosa, Rhizophora mangle and Avicennia germinans
Filed design / proponent claimCAMERR VCS Project Description v1.0, 1 Apr 2025 · physical p. 14–19Land and community benefits
The PDD records the proponent’s account. Agreements and consent were not independently checked in this reading.
Plan described as being co-designed, with later approval and dissemination promised. No payment or allocation amount is inferred.
State-owned mangrove land with local community use rights
Filed design / proponent claimMinistry authorization and free, prior and informed consent asserted
Filed design / proponent claim15 signed agreements covering an initial 17 named villages and camps, with consolidation
Filed design / proponent claimPlan described as being co-designed, with later approval and dissemination promised
Filed design / proponent claimValidation and monitoring
The operator plan specifies what will be measured. A validator is named on the registry, but no completed validation opinion or verified carbon outcome was read.
Permanent biomass plot
Converted to above- and below-ground biomass via filed equations
Filed designTarget for first verification; not achieved precision
CommitmentPer stratum, by different team members
CommitmentThe PDD says permanent plots had not been established and the final plot count would be set for first verification. A completed validation opinion or measured carbon outcome was not established in the sources read.
Stratified by planting year and degradation
Owner reportPermanent 0.04 ha plots stratified by planting year and degradation
Owner reportTree diameter and height, biomass and soil carbon, with quality checks
Owner reportPermanent plots not yet established at the October 2025 update; exact count still to be calculated
Owner reportSustainable development goals
Filed or operator-claimed contributions; no achieved impact is inferred.
Expected contribution
Goals 1, 13, 14 and 15 named by the operator
- Measured outcome in cited source
- –
SDG icon credit
Icons: United Nations Sustainable Development Goals. The content of this publication has not been approved by the United Nations and does not reflect the views of the United Nations or its officials or Member States.
Inspect source records and page citations
Goals 1, 13, 14 and 15 named by the operator
Owner reportPlanète Urgence 2024 activity report · physical p. 21Expected or claimed contribution, not measured SDG impact.Evidence coverage
Coverage describes what the sources document; it is not a performance score.
Filed carbon model
These estimates are ex ante. The public materials reviewed establish no verified removals.
Baseline
No figure or comparable measure was established in the sources read.
Project plan
Modelled total: 626,477 tCO₂e over 40 years · Modelled annual average: 15,662 tCO₂e per year · Non-permanence risk rating: 27% · Methodology: VM0033 v2.1
Reported
Registry annual estimate: 15,662 tCO₂e per year
Cells show source coverage, not project performance or assurance. Missing baseline and observed measures are left explicit.
Evidence gaps
The 41 calendar-year rows sum to 626,476 tCO₂e; the PDD states 626,477 tCO₂e total.
Open gap / source conflictNo completed validation report read
Open gap / source conflictNo verified removals established; 0 VCUs issued
Open gap / source conflictBoundary overlap remains unverified
Open gap / source conflictShow 1 more source claims
No republication permission established for PDD maps or owner photography
Open gap / source conflictSources and reading boundary
Inspect source documents and reading boundary
- Verra VCS 4845 record and public PDD
Documents > VCS PD 4845 02.04.2025_FINAL.pdf; 178 physical pages, v1.0 issued 1 Apr 2025.
- Planète Urgence programme summary
Physical p. 1; programme horizon and rounded target.
- CAMERR monitoring plan
October 2025 update; physical pp. 3–6.
- Planète Urgence 2024 activity report
Physical p. 21; operator SDG account.
Return to the project overview · Open the Verra register foundation