Bundled Landfill Gas Recovery Project in Indonesia
A single CDM registration covers three separate landfill sites, Samarinda in Kalimantan, Mataram in Lombok, and Palu in Sulawesi, jointly run by Indonesia's PT Dayak Eco Carpentry and the Netherlands' BGP Engineers. Its fixed crediting period ran 2013-2022, with estimated annual reductions of 74,338 tonnes of CO2 equivalent.
Inside the project
The bundled structure means one CDM registration, Project 4566, covers three geographically distant sites: Samarinda in Kalimantan, Mataram in Lombok, and Palu in Sulawesi.
Landfill gas is captured and processed under the ACM0001 methodology at all three sites, with a fixed crediting period that ran from 2013 to 2022.
Objectives
- Capture landfill gas across three bundled Indonesian sites under one CDM registration
Approach
- Landfill gas is captured at three geographically separate sites under one bundled CDM registration, applying the ACM0001 methodology.
Sources
Inspect 1 source
- cdm.unfccc.int ↗https://cdm.unfccc.int/Projects/DB/SGS-UKL1299843889.31/view
Documented by one public source so far.
Explore related climate work
Find other projects and tools for monitoring, restoration and climate adaptation.
Browse projectsBrowse tools