Mangrove & blue carbonRegistration requested

BlueMX Aztlán Blue Carbon Project

The VCS 2842 PDD defines six initial activity instances across 5,417 ha, a larger proposed expansion, ex-ante carbon estimates and an annual nested-plot monitoring plan.

Nayarit, MexicoMangrove and tidal wetlandVerra VCS 2842 · VM0033 v2.1
DigitizationStraatosHederaProject HubVerra Registry
Image credit
Regional context image of Marismas Nacionales, 25 November 2025; it does not delineate or verify BlueMX activity plots.Contains modified Copernicus Sentinel data 2025 · European UnionImage source ↗Licence ↗
Status

Registration requested

Registry observedVerra VCS 2842 public record, observed 24 Sep 2026 · Overview > Status
Registration date

–

Registry observedVerra VCS 2842 public record, observed 24 Sep 2026 · Overview > Registration date
Issued credits

0 VCUs

Registry observedVerra VCS 2842 public record, observed 24 Sep 2026 · Overview > Issued VCUs
Named validator

AENOR CONFIA, S.A. (UNIPERSONAL)

Registry observedVerra VCS 2842 public record, observed 24 Sep 2026 · Overview > Validation/verification bodyThe PDD says validation is being sought; a named validator is not a completed opinion.

Registration has been requested; no VCUs have been issued.

Project design

This PDD is for VCS 2842 in Nayarit, not the operator’s wider Mexico portfolio.

Verra public filingVCS 2842

BlueMX Aztlán

Version 1.0; 16 December 2025

Project maps are in the public PDD. Their republication rights were not established.

Open the source filing
Project title
BlueMX Atzlan Blue Carbon Project
Project proponents
BlueMX Mangrove A.C. and Blue Carbon Projects, LLC
PDD version and issue
Version 1.0; 16 December 2025
Methodology
VM0033 v2.1, VMD0052 and AR-Tool14; ARR and WRC
Filed crediting period
19 May 2022 to 18 May 2050, 28 years
Inspect source records and page citations
Project title

BlueMX Atzlan Blue Carbon Project

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 1The live registry spells Aztlán.
Project proponents

BlueMX Mangrove A.C. and Blue Carbon Projects, LLC

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 1, 12
PDD version and issue

Version 1.0; 16 December 2025

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 1
Methodology

VM0033 v2.1, VMD0052 and AR-Tool14; ARR and WRC

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 6–8, 72–78
Filed crediting period

19 May 2022 to 18 May 2050, 28 years

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 1, 19

Project milestones

The 2025 PDD and the live registry present different periods. Both are retained with their dates and source.

  1. Project start
    19 May 2022Filed design
  2. PDD crediting period
    19 May 2022 to 18 May 2050, 28 yearsFiled design
  3. Registry crediting end
    18 May 2052, 30 years from the listed startRegistry observation
  4. Filed phases
    Start-up 2022–25; formalization 2026–30; expansion 2031–61Filed design
  5. PDD issue
    Version 1.0; 16 December 2025Filed design
Inspect source records and page citations
Project start

19 May 2022

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 1, 18–19
PDD crediting period

19 May 2022 to 18 May 2050, 28 years

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 1, 19
Registry crediting end

18 May 2052, 30 years from the listed start

Registry observedVerra VCS 2842 public record, observed 24 Sep 2026 · Overview > Crediting period
Filed phases

Start-up 2022–25; formalization 2026–30; expansion 2031–61

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 20–21
PDD issue

Version 1.0; 16 December 2025

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 1

Project geography and imagery

The filed KML is mapped below. The regional satellite image is context, not evidence of restoration at a filed plot. PDD figures on physical pp. 11, 26 and 39 remain at source because reproduction rights were not established.

Filed geography

Six initial activity instances

The filed KML delineates six initial PAIs in Nayarit. Geodesic polygon area is about 5,424 ha; the PDD states 5,417 ha. Neither number is the wider 22,549-ha registry area field or proof of completed restoration.

Loading filed geometry…

Drag to explore · pinch, scroll or use controls to zoom. Geometry is a filed proposal, not an observed restoration outcome.

Map creditGeometry: Verra VCS 2842, VCS_Project_Area.kml · Documents > Other, observed 24 Sep 2026.Verra source record ↗Basemap: OpenStreetMap contributors. Areas calculated geodesically from filed coordinates.

Carbon forecast

Both annual figures are estimates. The PDD model includes future expansion; the source/version behind the registry value is unresolved.

Selected year2022
Gross model1,360 tCO₂e
Buffer–
After buffer model–
0115.1k230.2k345.3k460.4k20222049

Filed ex-ante removals model, not monitored removals, after-buffer credits or issuance. The filed 28 annual rows are labelled 2022–2049, while the PDD also describes a crediting period ending 18 May 2050. No 2050 annual row is supplied in this table.

Open all 28 filed annual rows
BlueMX Aztlán · VCS 2842 filed annual carbon schedule, tCO₂e
YearAnnual modelCumulative modelSource page
20221,3601,360BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
20234,2595,619BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
20248,59614,215BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
202512,76526,980BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
202634,01260,992BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
202773,029134,021BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2028125,593259,614BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2029188,565448,179BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2030259,619707,798BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2031318,8651,026,663BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2032364,0281,390,691BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2033398,1281,788,819BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2034423,4632,212,282BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2035441,1642,653,446BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2036452,4833,105,929BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2037458,5743,564,503BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2038460,3604,024,863BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2039458,4934,483,356BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 19
2040454,0244,937,380BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
2041447,5225,384,902BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
2042439,4455,824,347BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
2043430,1816,254,528BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
2044420,0576,674,585BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
2045409,3587,083,943BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
2046398,0937,482,036BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
2047386,3457,868,381BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
2048374,2678,242,648BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
2049361,9388,604,586BlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025, physical p. 20
PDD projected total
8,604,586 tCO₂e over 28 years, including expansionEx-ante model
PDD annual average
307,306 tCO₂e per yearEx-ante model
Registry annual estimate
175,910 tCO₂e per yearRegistry observed
Risk buffer assumption
25%Ex-ante model
Annual estimatestCO₂e/year
PDD annual average
307,306
Registry annual estimate
175,910
PDD annual average: 307,306 tCO₂e/yearTwo different published annual estimates; neither represents observed removal or issuance.
Inspect source records and page citations
PDD projected total

8,604,586 tCO₂e over 28 years, including expansion

Ex-ante modelBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical pp. 6, 19–20, 129–132; Tables 21–22
PDD annual average

307,306 tCO₂e per year

Ex-ante modelBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical pp. 6, 20
Registry annual estimate

175,910 tCO₂e per year

Registry observedVerra VCS 2842 public record, observed 24 Sep 2026 · Overview > Estimated annual emission reductions
Risk buffer assumption

25%

Ex-ante modelBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical pp. 129–132
Methodology

VM0033 v2.1, VMD0052 and AR-Tool14; ARR and WRC

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 6–8, 72–78

Restoration and biodiversity

The live registry and the filed PDD disagree by one hectare on the initial area; the wider figures are projections or geographic envelopes.

Filed activity design

Filed propagule recipe per chinampa

63 propagules

63 propagules dispersed per chinampa in the plan; species shares are derived from the stated counts, not a measured planting mix.

Avicennia20
Laguncularia40
Rhizophora3

Basis: One planned chinampa (63 propagules)

Seedlings per chinampa
5–7

Planned planting along restored channels

Commitment
Raised bed
≈2 m diameter

Chinampas spaced 6 m apart

Filed design
Area definitionsha
Registry description, initial area
5,416
Six initial project activity instances
5,417
Registry area field
22,549
Projected total restoration area
22,550
Registry description, initial area: 5,416 haInitial and projected restoration areas use different scopes. The larger grouped geographic envelope is listed below, outside this scale.
Initial instances
6

5,417 ha filed; registry description says 5,416 ha

Filed design / proponent claim
Potential sites
17

Estimated 17,133 additional eligible ha

Filed design / proponent claim
Contracted land
122,803 ha

Tenure area, not restored area

Filed design / proponent claim
Inspect source records and page citations
Registry description, initial area

5,416 ha

Registry observedVerra VCS 2842 public record, observed 24 Sep 2026 · Description > Initial project activity instances
Six initial project activity instances

5,417 ha

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 4, 10
Registry area field

22,549 ha

Registry observedVerra VCS 2842 public record, observed 24 Sep 2026 · Overview > Project area
Projected total restoration area

Approximately 22,550 ha including potential expansion

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 10
Potential additional sites

17 sites, estimated 17,133 eligible ha

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 10
Grouped geographic envelope

Approximately 324,217 ha

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 9–11
Contracted community land

122,803 ha

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 10A tenure-area definition, not hectares restored.
Restoration design

Hydrological channels, raised chinampas, planting and propagule dispersal

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 20–24
Native species

Avicennia germinans, Laguncularia racemosa and Rhizophora mangle

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 20–24

Land and community benefits

Participation, rights and benefit terms are PDD assertions pending independent review.

Benefit terms in the filing

Revenue sharing appears in the design; a separate benefit-sharing plan is marked “not applicable”. No payment or allocation amount is inferred.

7 source claimsCounts describe the record, not project performance
6 Filed design / proponent claim1 Registry observed
Land tenure

Ejido and community collective ownership; BlueMX does not acquire land title

Filed design / proponent claim
Assembly approvals

Proponent says assemblies approved participation and carbon-right transfers

Filed design / proponent claim
New sites

Future activity instances require FPIC, tenure proof and agreements

Filed design / proponent claim
PDD agreements

12 Ejidos with long-term agreements

Filed design / proponent claim
Show 3 more source claims
Registry description

13 Ejidos with agreements

Registry observed
Initial governance footprint

Four Ejidos and one community across six initial instances

Filed design / proponent claim
Benefit-sharing tension

Revenue sharing appears in the design; a separate benefit-sharing plan is marked “not applicable”

Filed design / proponent claim

Validation and monitoring

The filing describes future measurement and says validation is being sought. No field monitoring outcome, completed validation opinion or verified removal was established.

Filed measurement design

Annual nested plots

Adult trees10 × 10 mP1 · 100 m²
Saplings5 × 5 mSp1 · 25 m²
Seedlings1 × 1 mSp2 · 1 m²
Sampling cadence
Annual

Aboveground biomass; reported at each verification

Commitment
Initial plot generation
Up to 30 / unit

100 m² plots per management unit, adjusted to required sample size

Filed design
Sample-size assumption
10% at 90% CI

Margin of error and confidence level used in plot allocation

Filed design
Hydrology attribution
100 m

Distance threshold from restored channel for counting qualifying regrowth

Filed design

These are proposed plot dimensions, sampling rules and attribution thresholds. The cited filing does not establish a completed validation opinion or measured removals.

3 source claimsCounts describe the record, not project performance
2 Filed design / proponent claim1 Open gap / source conflict
Vegetation and biomass

Annual nested field plots

Filed design / proponent claim
Soil carbon

Soil sampling and quality controls at verification events

Filed design / proponent claim
Observed outcomes

No published field-monitoring results found in the eight registry documents reviewed

Open gap / source conflict

Sustainable development goals

Filed or operator-claimed contributions; no achieved impact is inferred.

7 / 17 goals namedFiled contribution claims · select a goal for its proposed measure
01

Target 1.2

Households below the national poverty line; project employment and net income

Expected by first monitoring
Yes
SDG icon credit

Icons: United Nations Sustainable Development Goals. The content of this publication has not been approved by the United Nations and does not reflect the views of the United Nations or its officials or Member States.

Inspect source records and page citations
Expected SDG contributions

Goals 1, 2, 8, 11, 13, 14 and 15

Filed design / proponent claimBlueMX Atzlan VCS Project Description v1.0, 16 Dec 2025 · physical p. 36–38, Table 5Several are marked future or not achieved by the first monitoring event.

Evidence coverage

Coverage describes what the sources document; it is not a performance score.

DomainBaselineProject planReported

Competing annual model estimates

Both annual figures are estimates. The PDD model includes future expansion; the source/version behind the registry value is unresolved.

Baseline

No figure or comparable measure was established in the sources read.

Project plan

PDD projected total: 8,604,586 tCO₂e over 28 years, including expansion · PDD annual average: 307,306 tCO₂e per year · Risk buffer assumption: 25% · Methodology: VM0033 v2.1, VMD0052 and AR-Tool14; ARR and WRC

Reported

Registry annual estimate: 175,910 tCO₂e per year

Cells show source coverage, not project performance or assurance. Missing baseline and observed measures are left explicit.

Evidence gaps

8 source claimsCounts describe the record, not project performance
8 Open gap / source conflict
Annual table end year

The filed annual table ends at 2049 although the PDD describes a crediting period ending 18 May 2050; no 2050 annual row is supplied.

Open gap / source conflict
Area difference

5,416 ha registry description versus 5,417 ha PDD initial instances

Open gap / source conflict
Period difference

Registry ends 2052; PDD ends 2050

Open gap / source conflict
Annual estimate difference

175,910 registry versus 307,306 PDD tCO₂e per year

Open gap / source conflict
Show 4 more source claims
Ejido count difference

13 in registry description; 12 in PDD

Open gap / source conflict
Validation and verification

No completed opinion or monitored removals established in materials reviewed

Open gap / source conflict
Underlying agreements

Contracts and assembly resolutions cited but not independently checked

Open gap / source conflict
Image rights

No republication permission established for PDD maps or owner photography

Open gap / source conflict

Sources and reading boundary

2 source documentsVerra VCS 2842 record and public PDD
Inspect source documents and reading boundary
  1. Verra VCS 2842 record and public PDD

    Documents > VCS PD 2842 16DEC2025_FV.pdf; 166 physical pages, v1.0 issued 16 Dec 2025.

  2. BlueMX project areas

    Operator portfolio context. Its separate conservation initiative is outside VCS 2842.

Return to the project overview · Open the Verra register foundation