Wayang Windu Phase 2 Geothermal Power Project
A geothermal project in Indonesia, listed on the Verra registry.
Registry data
(opens another site)The project's own documents and description, on the Verra registry
- Registry id
- VCS688 (opens another site)
- Status
- Late to Verify
- Scope
- Renewable Energy
- Type
- Geothermal
- Reduction or removal
- Reduction
- Region
- South-Eastern Asia
- Country
- Indonesia
- Developer
- Star Energy Geothermal (Wayang Windu) LimitedStar Energy Geothermal (Wayang Windu) Limited
- Methodology
- ACM0002
- Registered
- 2020-04-06
Credits
- Issued
- 1,451,189
- Retired
- 1,442,708
- Remaining
- 8,481
- Buffer pool deposits
- 0
- First vintage
- 2010
Issued and retired by year
- Issued, by vintage
- Retired, by year
1,406,7892010 · issued 1,406,789 · retired 02011 · issued 0 · retired 65,0002012 · issued 0 · retired 63,0002013 · issued 0 · retired 82,7822014 · issued 44,400 · retired 49,9232015 · issued 0 · retired 8,2302016 · issued 0 · retired 32,7292017 · issued 0 · retired 30,3452018 · issued 0 · retired 126,6272019 · issued 0 · retired 133,4042020 · issued 0 · retired 465,8082021 · issued 0 · retired 48,4562022 · issued 0 · retired 25,6412023 · issued 0 · retired 4,0122024 · issued 0 · retired 232,3682025 · issued 0 · retired 50,0262026 · issued 0 · retired 24,357
20102026
Figures by year
| Year | Issued | Retired |
|---|---|---|
| 2010 | 1,406,789 | |
| 2011 | 65,000 | |
| 2012 | 63,000 | |
| 2013 | 82,782 | |
| 2014 | 44,400 | 49,923 |
| 2015 | 8,230 | |
| 2016 | 32,729 | |
| 2017 | 30,345 | |
| 2018 | 126,627 | |
| 2019 | 133,404 | |
| 2020 | 465,808 | |
| 2021 | 48,456 | |
| 2022 | 25,641 | |
| 2023 | 4,012 | |
| 2024 | 232,368 | |
| 2025 | 50,026 | |
| 2026 | 24,357 |