Hydroelectric Project MULATOS II

A hydropower project in Colombia, listed on the Verra registry.

Colombia · Verra VCS · Renewable power

Registry id
VCS1473 (opens another site)
Status
Registered
Scope
Renewable Energy
Type
Hydropower
Reduction or removal
Reduction
Region
Latin America and the CaribbeanLatin America and the Caribbean
Country
Colombia
Developer
Energía del Suroeste S.A E.S.PEnergía del Suroeste S.A E.S.P
Methodology
ACM0002
Registered
2015-10-02

Credits

Issued
39,577
Retired
39,577
Remaining
0
Buffer pool deposits
0
First vintage
2019

Issued and retired by year

  • Issued, by vintage
  • Retired, by year
20192023
Figures by year
Credits issued by vintage and retired by year
YearIssuedRetired
20195,372
202013,985
202120,220
202339,577