Renewable powerActive
Brenwe Hydropower Plant
A 400 kW run-of-river hydropower plant on Malekula island, built under the ADB-financed Vanuatu Energy Access Project and commissioned in December 2023. ADB reports it now supplies up to 90% of the Malekula grid's needs and displaces more than 200,000 litres of diesel a year.
OperatorMinistry of Finance & Economic Management (executing agency)
EcosystemRun-of-river small hydropower
StandardNone
StatusActive
LocationMalekula island, Vanuatu
Overview
Inside the project
The Ministry of Finance & Economic Management is named as the project's executing agency.
The plant is part of the wider ADB-supported Vanuatu Energy Access Project, commissioned in December 2023.
400 kW
Plant capacity
90%
Share of Malekula grid needs supplied
200,000+ litres/yr
Diesel displaced
Objectives
- Supply Malekula's grid with run-of-river hydropower
- Displace diesel generation on the island
Approach
- Run-of-river hydropower on Malekula island feeds the local grid, financed under the Vanuatu Energy Access Project.
Sources
Inspect 1 source
- adb.org ↗https://www.adb.org/news/adb-vanuatu-commission-brenwe-hydropower-plant
Documented by one public source so far.