Babilonia Hydroelectric Project
A hydropower project in Honduras, listed on the Verra registry.
Registry data
(opens another site)The project's own documents and description, on the Verra registry
- Registry id
- VCS141 (opens another site)
- Status
- Late to Verify
- Scope
- Renewable Energy
- Type
- Hydropower
- Reduction or removal
- Reduction
- Region
- Latin America and the CaribbeanLatin America and the Caribbean
- Country
- Honduras
- Developer
- ENERGISA S.A.
- Methodology
- AMS-I.D
- Registered
- 2020-04-06
Credits
- Issued
- 118,866
- Retired
- 114,612
- Remaining
- 4,254
- Buffer pool deposits
- 0
- First vintage
- 2007
Issued and retired by year
- Issued, by vintage
- Retired, by year
44,7382007 · issued 4,375 · retired 02008 · issued 24,004 · retired 02009 · issued 17,264 · retired 9,8052010 · issued 22,610 · retired 17,7002011 · issued 19,315 · retired 44,7382012 · issued 21,241 · retired 2,5242013 · issued 10,057 · retired 2,1102014 · issued 0 · retired 4,3422015 · issued 0 · retired 26,6612016 · issued 0 · retired 2,4542017 · issued 0 · retired 3,5502018 · issued 0 · retired 2542019 · issued 0 · retired 1152020 · issued 0 · retired 92021 · issued 0 · retired 02022 · issued 0 · retired 02023 · issued 0 · retired 02024 · issued 0 · retired 02025 · issued 0 · retired 350
20072025
Figures by year
| Year | Issued | Retired |
|---|---|---|
| 2007 | 4,375 | |
| 2008 | 24,004 | |
| 2009 | 17,264 | 9,805 |
| 2010 | 22,610 | 17,700 |
| 2011 | 19,315 | 44,738 |
| 2012 | 21,241 | 2,524 |
| 2013 | 10,057 | 2,110 |
| 2014 | 4,342 | |
| 2015 | 26,661 | |
| 2016 | 2,454 | |
| 2017 | 3,550 | |
| 2018 | 254 | |
| 2019 | 115 | |
| 2020 | 9 | |
| 2025 | 350 |